Media
paks-2-
Shortcuts on this page
Media
Bellona nuclear digest, December 2023
paks-2-
paks 2 Vitaly Polyanin (far left), director of the project for building the Paks-2 NPP, during a visit to the building site in Hungary by Rosatom head Aleksey Likhachev (fifth on the left) in mid-November 2023 Credit: Paks2.hu
paks 2 Vitaly Polyanin (far left), director of the project for building the Paks-2 NPP, during a visit to the building site in Hungary by Rosatom head Aleksey Likhachev (fifth on the left) in mid-November 2023 Credit: Paks2.hu